Change order and ASI histories as licensable process records
By SourceX Editorial · Reviewed by Noah Loul ·
Short answer
Change order and ASI histories can be licensable process records when an architecture firm controls them and they link a question to a design decision and its cost and time impact. Keep reasons, sheet references, dates and outcomes; remove client names, contractor names, contract sums and signatures before any record leaves the firm.
Key takeaways
- A linked RFI, ASI and change order sequence records a cause, a design decision and a consequence.
- Reason codes such as owner request, field condition or code requirement make change histories far more useful.
- Contract sums, client and contractor names and signatures are removed or generalized before licensing.
- Change records that attribute cost to design errors need counsel and insurer review before any scope is set.
- Contractor pricing and logs held only in a contractor's Procore account usually fall outside what the architect can license.
Why change histories count as process records#
Change order and ASI histories count as process records because each one documents how a project team handled a change: what triggered it, what the architect decided, how the contractor priced it and what the owner approved. Few other records show a professional judgment and its consequence in such a compact, dated form.
AI developers building tools for construction administration, document review and project controls look for exactly this kind of sequence. A drawing revision on its own says little; a revision tied to the question that caused it and to the cost and schedule effect that followed shows a decision made under real constraints.
The chain from RFI to ASI to change order#
The change chain runs from a question to a priced, approved change, and its value depends on keeping every link. Not every change passes through every step, but a typical sequence looks like the one below.
Firms that number ASIs and bulletins in one sequence and cross-reference the originating RFI make the chain easy to rebuild years later. Firms that issued revisions by email alone often find the chain broken at the second or third step.
- A contractor submits an RFI about a conflict, a missing dimension or a field condition.
- The architect answers in writing, sometimes with a sketch or a reference to existing sheets.
- If the answer changes the work, the architect issues an ASI or bulletin with revised sheets, often on an AIA G710 form or in a Procore or Newforma log.
- The owner issues a proposal request, or the contractor prices the change in a change order request.
- The owner approves a change order, or directs the work through a construction change directive while the price is settled.
- The change is closed with its final cost and time effect recorded.
- 01Your work records
- 02Personal details removed
- 03You approve the release
- 04Licensed to AI developers
Where each link lives in an architecture firm's systems#
Each link in the chain usually lives in a different system, which is why change histories are rarely as complete as firms assume. The table shows where architecture firms typically find each record and which fields carry the link to the next one.
The last row is easy to overlook. When an owner change also changes the firm's own scope, the additional services record in Deltek or BQE shows the design effort behind it and ties the change history to the firm's project management records.
| Record | Typical location | Fields that carry the link |
|---|---|---|
| RFI and response | Procore, Newforma or a spreadsheet log | RFI number, sheet references, response date |
| ASI or bulletin | ASI log, Procore drawings tool or project folder | ASI number, originating RFI, revised sheets |
| Revised sheets and markups | Revit revision schedules and Bluebeam markup sets | Revision number, sheet number, date |
| Proposal request or change order request | Contractor's system, copied to the architect | Request number, referenced ASI |
| Change order or change directive | Signed forms in the project folder or Procore | Change order number, cost and time impact |
| Additional services request | Deltek or BQE and client correspondence | Project number, phase, scope description |
Fields to keep, generalize or remove#
The fields to keep are the ones that explain the change; the fields to remove are the ones that identify people, parties and money. Generalizing sits between the two and preserves useful structure without revealing who or where.
Apply the rules to free text as well as structured fields. RFI questions and responses often name the owner's representative, the superintendent or the street address inside the body text, which a field-level rule will miss.
| Field | Handling | Why |
|---|---|---|
| RFI question and response text | Keep, with names and addresses removed from the text | The reasoning is the valuable part |
| Reason or cause code | Keep | Classifies why changes happen |
| Sheet and specification references | Keep | Ties each change to the design documents |
| Dates and turnaround | Keep, or shift consistently across the project | Preserves sequence and response time without pinpointing the project |
| Time impact | Keep as recorded | Shows the schedule consequence |
| Contract sums and change amounts | Remove, or convert to relative measures | Commercially sensitive for owner and contractor |
| Client, contractor and consultant names | Replace with role labels | Identifies parties to the contracts |
| Project name and address | Replace with building type and region | Identifies the client and the site |
| Signatures, seals and stamps | Remove | Identify individuals and imply approval |
Reason codes make a change history more valuable#
Reason codes make a change history more valuable because they turn a list of changes into a record of why projects change. Common categories include owner-requested changes, unforeseen field conditions, code or authority requirements, value engineering and coordination between disciplines.
One category needs care. Changes coded as design errors or omissions can be sensitive for the firm's professional liability position, and some firms code them differently or not at all. Ask counsel and the firm's insurer whether those records should be excluded, generalized or kept before any scope is set.
If the firm never used reason codes, they can sometimes be added during preparation from the RFI and ASI text. That work should follow written rules so the same kind of change is classified the same way every time.
Who controls the change record?#
The architect usually controls its own RFI responses, ASIs, bulletins and revised sheets as instruments of service, subject to the client contract. Under the AIA B101 form, for example, the owner receives a nonexclusive license to use the architect's instruments of service for the project itself, which is a narrower grant than ownership. The contractor's pricing, the owner's approvals and anything held only in a contractor's Procore account are other parties' records.
In practice, a licensable change history often consists of the firm's own logs and responses, with cost and time outcomes reduced to fields the firm recorded itself. Where the contract transfers ownership of documents to the client, or a confidentiality clause covers construction administration records, the project stays out unless the client agrees in writing.
Illustrative: a retail and light industrial practice scopes its change logs#
Illustrative: a fictional architecture firm that designs grocery stores, neighborhood retail centers and light industrial buildings reviews its construction administration records. Its own Newforma logs number RFIs, ASIs and bulletins in linked sequences, while on many projects the contractor's Procore account holds change orders the firm can view but not export.
The CEO approves a scope built from the firm's own logs on projects under its standard agreement, with reason codes added from response text under written rules. Contractor-hosted logs, projects with client confidentiality clauses and changes coded as design omissions are excluded. Client names, contractor names and change amounts are removed, and time impacts are kept.
How SourceX handles change histories#
SourceX handles a change history package through the SourceX five-step transaction: Supply, Rights, Preparation, Approval and Delivery. The opening fit check works from descriptions of the logs, such as their types, the years they cover and the fields that link them, so no log entries leave the firm.
When a firm goes ahead, the rights review separates firm-controlled records from contractor and owner records, preparation applies the keep and remove rules above, and the SourceX Evidence Packet records what was included, what was removed and who approved the release.
Frequently asked questions
Do change histories need cost data to be useful?
Cost data helps, but exact amounts are rarely necessary. Relative measures, such as whether a change added cost or time and in which direction, preserve much of the signal without exposing contract sums. The firm and the buyer agree the level of detail during scoping.
Are bulletins handled the same way as ASIs?
For licensing purposes, yes. Both are architect-issued documents that revise the design, and what matters is that each is numbered, dated and linked to the RFI or request that caused it and to the change that followed.
Can projects with an open claim be included?
No. Records tied to an open claim or legal hold stay out of any licensing scope until counsel releases them. Including them could complicate the dispute and the firm's defense, and the value rarely justifies the risk.
Do we need to include the drawings themselves?
Not always. Many change history packages rely on sheet references and revision descriptions rather than the drawings. Adding drawings raises separate ownership and de-identification questions, so they are often scoped separately or left out.
Where do construction change directives fit?
Construction change directives belong in the same chain. They record changes ordered before the price was agreed, which shows how cost disagreements were handled. Remove amounts and party names in the same way as for change orders.
Sources
- AIA B101 grants the Owner a nonexclusive license to use the Architect's Instruments of Service solely and exclusively for constructing, using, maintaining, altering and adding to the Project. Source
Related resources
- IndustryLegal data
- GlossaryData processing agreement
- QuestionCan I license data from India?
- QuestionCan I license data from Philippines BPO operations?
- InsightWhat compliance checks do payment processors need before licensing data to AI companies?
- InsightIs an AI data buyer a controller, a processor or a third party?
See if your company qualifies
A short company assessment. No data uploads are needed.