Systems and records
How long should architects and engineers keep project records?
By SourceX Editorial · Reviewed by Noah Loul ·
Short answer
Architects and engineers should keep each project's core record set for at least the longest of several clocks: the state statute of repose, the limitations period, contract terms, insurer conditions and any legal hold. There is no single national period, so set retention by record type and keep copies that will still open when a claim arrives.
Key takeaways
- No single national rule sets one retention period for A/E project records; state law, contracts and insurers set it project by project.
- The records showing what the firm designed, reviewed and approved usually earn the longest retention.
- Record the trigger date that starts each clock, often substantial completion, in the project record itself.
- A file kept in a format nobody can open is not really kept, so plan exports and format changes.
- A legal hold suspends deletion regardless of what the schedule says.
The short answer: the longest clock wins#
Architect and engineer record retention is set by whichever clock runs longest for a given project. Statutes of repose cap how long after completion a claim can be brought, limitations periods often run from when a problem is discovered, owner contracts may add retention or delivery duties, and professional liability insurers publish risk-management guidance on keeping records.
Because repose periods differ by state and contracts differ by client, one firm-wide number rarely fits. Many firms keep a default for most projects and flag exceptions for public work, housing or clients with stricter terms. This is general information, not legal advice; counsel who knows the states where you practice should set the actual periods.
Which clocks set the retention period?#
Each clock answers a different question. Repose asks how long the firm can face a claim at all after completion, limitations asks how long after a problem surfaces, and contracts and insurers add conditions of their own. A good schedule names every clock that applies to a project, not only the one the firm happens to remember.
| Clock | What usually starts it | Where to check | Common trap |
|---|---|---|---|
| Statute of repose | A completion event defined in state law, such as substantial completion | The statute in the project's state | Applying the firm's home state to out-of-state projects |
| Statute of limitations | Often discovery of the defect or injury | State law, with counsel | Assuming it always ends before repose |
| Owner contract | Contract signature, closeout or final payment | Records, audit and deliverables clauses | Missing duties added in owner-drafted amendments |
| Insurer conditions | Policy terms and claim or circumstance reporting | The professional liability policy and broker | Destroying files tied to a notified circumstance |
| Public agency rules | Project type and funding source | Agency contracts and grant terms | Applying private-project defaults to public work |
| Legal hold | Notice of a claim, dispute or investigation | Counsel's hold notice | Letting automated deletion keep running |
- 01Your work records
- 02Personal details removed
- 03You approve the release
- 04Licensed to AI developers
Which project records need the longest retention?#
The records that need the longest retention are the ones that show what the firm designed, what it reviewed and what it approved. In a claim, the issued drawing set and the construction administration trail usually matter more than renderings or marketing boards.
Ownership shapes who should keep what. Under AIA B101-2017 Section 7.2, the architect and its consultants are deemed the authors and owners of their Instruments of Service, so many firms hold the most complete design record even after the owner receives its set. Negotiated contracts can change that, so check the signed agreement for each project.
| Record type | Where it often lives | Retention tier | Copy to keep |
|---|---|---|---|
| Issued and sealed drawings and specifications | Revit, CAD, Bluebeam sets | Longest | Issued PDF set plus native models |
| Addenda, bulletins and supplemental instructions | Document management or Procore | Longest | Issued versions with dates |
| RFIs and submittal reviews | Procore, Bluebeam Studio, email | Longest | Full log with stamps, comments and responses |
| Change orders and field reports | Procore, project folders | Longest | Signed versions with photos |
| Calculations and design criteria | Analysis software, project folders | Longest | Final calculation packages in a readable format |
| Contracts, amendments and fee records | Deltek, contract files | Longest of contract and legal periods | Executed copies |
| Project email and meeting minutes | Microsoft 365, project folders | Long, filed to the project | Exported or filed messages |
| Superseded working files | Revit worksharing, local drives | Set by policy with counsel | Often only the issued milestones |
When does the retention clock start?#
The retention clock usually starts at a project event, not on the date a file was created. Depending on the state and the contract, that event might be substantial completion, a certificate of occupancy, final payment or termination of services. A firm that keys deletion to file dates will remove construction-phase records too early.
- Pick one trigger field per project, such as the substantial completion date, and store it in the project record in Deltek or your ERP.
- Note the project's state and any contract retention clause next to the trigger date.
- Calculate the date the records become eligible for destruction from the longest applicable clock, and have counsel confirm the rule.
- Review eligible projects on a fixed cycle and check for claims, holds or follow-on work before anything is destroyed.
- Log every destruction with the project, record types, date and approver.
Keeping records readable for the whole period#
A record kept in a form nobody can open is not really kept. Retention periods for design firms often outlast the software versions, cloud products and subscriptions that created the files, so the schedule should name the format each record family is kept in.
Cloud tools sharpen the problem. Procore Extracts saves most Procore items as PDFs while documents and photos keep their original file types, which suits reading but not later analysis. Autodesk's Data Connector delivers CSV tables that can be downloaded for up to 30 days after each extraction, so someone has to save them. Deltek's Backup Database utility exists only in on-premise Vantagepoint, so cloud customers need another route to a full copy.
Product retirements are the other risk. Autodesk moved BIM 360 Team and A360 Team files to read-only access and fully retired the products at the end of 2023, after which access to the files was removed. Firms that had not copied or downloaded their project files lost them from that location.
Illustrative: a structural engineering firm writes its schedule#
Illustrative: a fictional structural engineering firm works on commercial and public projects across several states. Its contracts and fees sit in Deltek Vantagepoint, its models and calculations in Revit and analysis software, its markups in Bluebeam, and its RFIs and submittals in owner-hosted Procore projects.
The managing principal asks counsel to set a default tied to the longest repose period among the firm's states, with a separate rule for public contracts. The firm adds a substantial completion field to every Deltek project, runs Procore Extracts at closeout for each owner-hosted project while it still has access, and saves final calculation packages as PDFs beside the native files.
The outcome is a schedule the firm can actually run. Destruction now happens project by project after review, and when a claim arrives on an older parking structure, the RFI log and sealed calculations are exactly where the schedule says they are.
What happens when the retention period ends?#
At the end of a project's retention period, each record family gets one of three outcomes: secure destruction with a log entry, a documented extension for a business reason, or a move to cheaper archive storage. Check for holds and pending claims before any of them.
Some firms now ask whether an old archive has value beyond risk management. Records that link RFIs, submittal reviews and change decisions show how professionals solve real design problems, which interests AI developers. Licensing them depends on client agreements and confidentiality terms, so SourceX starts with a metadata-only fit check and handles rights in the Rights step of the SourceX five-step transaction, before any preparation or delivery.
Frequently asked questions
Do we need to keep paper originals of sealed drawings?
Not always. Many firms keep an issued PDF set as the record copy, but state licensing boards, public agencies and some owner contracts set their own rules for signed and sealed documents. Check the requirements where each project is located before discarding paper sets, and record the decision in the schedule.
How should a firm handle projects in several states?
Record the state where each building sits, because the governing repose period is usually tied to the project location, not the firm's headquarters. Firms that practice widely often set a default from the longest common period and keep a short exception list. Counsel should confirm which state's law applies.
Does our professional liability insurer set a retention period?
Policies rarely set a single number, but they usually require cooperation with claims, and carriers publish risk-management guidance on records. Ask your broker what your carrier recommends, and make sure the schedule never destroys files connected to a reported claim or a circumstance you have notified.
What about project email and Teams messages?
Project decisions often live in email and chat, so treat project correspondence as a project record rather than personal mail. File key messages to the project or export project mailboxes at closeout, and check that Microsoft 365 retention policies do not delete messages before the project's period ends.
Can we license old project records instead of destroying them?
Possibly, but only after a rights review. Client agreements, confidentiality clauses and ownership of instruments of service decide what a firm may license, and client-owned deliverables are often excluded. Firm-authored review records, such as RFI and submittal logs, may be easier to clear than full drawing sets.
Sources
- Under AIA B101-2017 Section 7.2, the Architect and the Architect's consultants are deemed the authors and owners of their respective Instruments of Service. Source
- Procore Extracts downloads most Procore items as PDFs, while documents and photos keep their original file type. Source
- Autodesk's Data Connector delivers CSV files for each table, and the files can be downloaded for up to 30 days after extraction. Source
- Deltek's Vantagepoint Backup Database utility exists only in the on-premise product and does not apply to the cloud product. Source
- Autodesk moved BIM 360 Team and A360 Team files to read-only access and fully retired the products at the end of 2023, after which access to the files was removed. Source
Related resources
- InsightDo you need client consent to license de-identified RFIs and submittals?
- InsightClosing an architecture firm: records, clients and licenses checklist
- InsightDoes licensing company data need lender consent under a credit agreement?
- QuestionWho owns enterprise data?
- QuestionCan SaaS data be licensed?
- IndustryLegal data
See if your company qualifies
A short company assessment. No data uploads are needed.